These lines are controlled by the Energy Authority and provide power to the building. The line (or lines) will run from the pole down to the building where it connects to the POA (Point of Attachment). Regardless if it is 3 phase or not, we can organise to have Tiger Tails installed on these lines and a rubber insulating mat installed at the point of attachment, where required.